News

Arrival at TUPRAS (Turkey) to install our pilot plant as part of the MOF4AIR project.
Arrival at TUPRAS (Turkey) to install our pilot plant as part of the MOF4AIR project.
The second MOF4AIR pilot plant developed by EDIBON has arrived at TUPRAS. It has been safely offloaded and located in Izmit (Turkey). Our expert engineers have already arrived at Tupras to install the pilot plant created for the MOF4AIR project.
Setting up at DN Colleges Group (UK)
Setting up at DN Colleges Group (UK)
We are pleased to announce our latest installation at DN Colleges Group International (UK). There we installed our Computer Controlled Geothermal (low enthalpy) Energy Unit (EG5C)
Setting up at some universities in Cuba
Setting up at some universities in Cuba
There we have traveled to the University of Santa Clara, the Technological University of Havana (CUJAE), the University of Matanzas, University of Cienfuegos and the University of Sancti Spiritus. We have had the honor of installing many of our equipment in their facilities
Arrival at Technology Centre Mongstad (TCM) (Norway) to install the pilot plant as part of the MOF4AIR project.
Arrival at Technology Centre Mongstad (TCM) (Norway) to install the pilot plant as part of the MOF4AIR project.
At EDIBON we are very proud to be part of the MOF4AIR project, manufacturing and designing the pilot plants. In MOF4AIR they use MOFs optimized for carbon adsorption to capture CO2 in enhanced carbon capture processes.
Setting up in Papua New Guinea
Setting up in Papua New Guinea
We have traveled to Oceania to make an installation in Papua New Guinea. There we have installed our Analysis of Three-phase Power Lines Application, (AEL-TI-01), our Distribution Transfomer with Motor Regulation Application (AEL-TI-02), Arc Suppression Coil Application (AEL-TI- 03), Underground Transmission Lines Application (AEL-TI-04), Parallel and Series Transmission Lines Application (AEL-TI-05), our Analysis of Power Flows in...
EDIBON is part of the MOF4AIR project
EDIBON is part of the MOF4AIR project
MOF4AIR is a Horizon 2020 project gathering 14 partners from 8 countries to develop and demonstrate the performances of MOF-based CO2 capture technologies in power plants and energy intensive industries to stop climate change.
Setting up at North Lindsey College
Setting up at North Lindsey College
Recently, we had the honor of installing our THIBAR22C unit at the North Lindsey College in the UK. The unit has as aim introduce the student to the study of the heat pumps, air conditioning...
Setting up at DN Colleges Group International
Setting up at DN Colleges Group International
Today we want to talk about the latest installation we have done in the UK, specifically in the DN Colleges Group International. There we have installed our Computer Controlled Geothermal (low enthalpy) Energy Unit (EG5C)
 Setting up at Hull College in Kingston Upon Hull
Setting up at Hull College in Kingston Upon Hull
We present you the last installation we did at Hull College in Kingston Upon Hull (England) There we have installed our Computer Controlled Waves Energy Unit (EOMC) and our Computer Controlled Geothermal (low enthalpy) Energy Unit (EG5C)
Setting up in some centers in Consenza (Italy)
Setting up in some centers in Consenza (Italy)
Today we want to present you some of the latest installations we have done in three centers in Cosenza (Italy)
Ask for information