AE-PLC-CPD Defective Pieces Sorter Workstation Application

DEFECTIVE PIECES SORTER WORKSTATION APPLICATION - AE-PLC-CPD

INNOVATIVE SYSTEMS

The "AE-PLC-CPD" is a Defective Pieces Sorter Workstation Application commanded by a PLC, which measures the deepness of the hole in the pieces.

See general description

RELATED NEWS

General Description

The "AE-PLC-CPD" is a Defective Pieces Sorter Workstation Application commanded by a PLC, which measures the deepness of the hole in the pieces. If the hole has not the correct deepness, the workstation sends the defective pieces to a rejection zone. Otherwise, the workstation sends the piece to the output of the unit.

The "AE-PLC-CPD" workstation is designed as a modular system to facilitate the understanding of the unit. The main components are:

  • The PLC: is composed by the CPU PLC unit and all the extra modules needed to perform a correct working of the workstation.
  • The control panel: with start/stop button, emergency pushbutton, reset button, light indicators to show current state of the process, etc.
  • The pneumatic circuit: contains the required solenoid valves, filters and regulators to assure the correct working and safety of the unit.
  • The workstation: is composed by real industrial components used by the industrial sorting systems such as reflective optical sensors, conveyor system, pneumatic actuators, etc.

The "AE-PLC-CPD" is an independent workstation that can work alone and/or in conjunction with other workstation to make up a complete Flexible Manufacturing system*.

*The Flexible manufacturing systems product list is available at "Flexible Manufacturing Systems (FMS)" area of the general catalogue.

Exercises and guided practices

GUIDED PRACTICAL EXERCISES INCLUDED IN THE MANUAL

  1. Introduction to flexible manufacturing system (FMS).
  2. Introduction to pneumatics and electro-pneumatics.
  3. Study of the sensor detection.
  4. Configuration of a pneumatic application.
  5. Manual control of a sorting system.
  6. Automatic control of a sorting system.
  7. Change the parameters of the sorting process.
  8. Optimize the process time.
  9. Study and analysis of the faults inserted in the process with the fault generation module.

REQUIRED ELEMENTS

ADDITIONAL RECOMMENDED ELEMENTS

SIMILAR UNITS AVAILABLE

Quality

AFTER-SALES SERVICE

Ask for information