WIT-WPS Wiring Installation Training for Wind Power Systems

WIRING INSTALLATION TRAINING FOR WIND POWER SYSTEMS - WIT-WPS

INNOVATIVE SYSTEMS

The unit of Wiring Installation Training for Wind Power Systems, "WIT-WPS", has been designed by EDIBON for the formation at a professional-practical level in the field of the installations, wiring, and commissioning of wind power energy systems. With this unit, students starting their professional careers as electrical installers, fitters, or electrical maintenance technicians will get hands-on learning with units that closely mirror the electrical installations they will work on in the future.

See general description

RELATED NEWS

General Description

The unit of Wiring Installation Training for Wind Power Systems, "WIT-WPS", has been designed by EDIBON for formation at a professional-practical level in the field of installations, wiring, and commissioning of wind power energy systems.

This unit provides future professionals with knowledge and essential skills in the assembly, installation, wiring, and commissioning of a wind power installation focused on residential and commercial applications. This unit offers different kits to provide experience in the installation of stand-alone and grid-connected wind power systems.

To acquire complete knowledge, the unit includes a specific manual that explains, at a theoretical-practical level, the aspects concerning installation procedures, wiring, and commissioning of these installations.

Exercises and guided practices

GUIDED PRACTICAL EXERCISES INCLUDED IN THE MANUAL

  1. Wind turbine start-up wiring.
  2. Wiring of a wind generation system and two DC lamps.
  3. Start-up of the wind generation system to energize two DC.
  4. Verification of the correct wiring and simulation of a failure of a wind generation system feeding two DC lamps.

Some possible practices with the recommended additional elements:

  1. Wiring of the wind turbine to voltage regulator.
  2. Wiring of the battery to voltage regulator.
  3. Wiring of the voltage regulator to current inverter.
  4. Wiring of wind turbine to the on-grid installation.
  5. Testing of the correct battery charge.
  6. Wiring of a wind generation system in an isolated grid feeding two AC lamps.
  7. Start-up of the wind generation system for isolated networks feeding two AC lamps.

MORE PRACTICAL EXERCISES TO BE DONE WITH THE UNIT

  1. Several other exercises can be done and designed by the user.

Quality

AFTER-SALES SERVICE

Ask for information