WIT-ISG Práticas de Cabeamento em Elementos de Sinalização Industriais

WIRING INSTALLATION TRAINING FOR INDUSTRIAL SIGNALLING ELEMENTS - WIT-ISG

SISTEMAS INOVADORES

The Wiring Installation Training, Industrial Signalling Elements application, "WIT-ISG", has been designed by Edibon for the formation at professional-practical level in the field of the installations, wiring and testing of the signaling application present in industry.

Ver descrição geral

NOTÍCIAS RELACIONADAS

Descrição Geral

The Wiring Installation Training, Industrial Signalling Elements application, "WIT-ISG", has been designed by Edibon for the formation at professional-practical level in the field of the installations, wiring and testing of the signaling application present in industry.

This application provides the future professionals with knowledge and essential skills on the assembly, installation, wiring and testing of the optical and acoustic industrial signals. This application also offers different kits to provide experience in the installation of numerous signalling elements such as control and signaling lights and acoustic devices, alarms, intercommunication.

To acquire a complete knowledge, the application includes a specific manual in which is explained, at theoretical-practical level, the aspects concerning to the installation procedures and wiring of these installations.

EXERCÍCIOS E PRÁTICAS GUIADAS

EXERCÍCIOS PRÁTICOS GUIADOS INCLUÍDOS NO MANUAL

  1. Wiring, installation and testing of ringer managed from apoint.
  2. Wiring, installation and testing of ringer managed from twopoints.
  3. Wiring, installation and testing of buzzer managed from apoint.
  4. Wiring, installation and testing of buzzer managed from twopoints.
  5. Wiring, installation and testing of blinking optical signaling.
  6. Wiring, installation and testing of optical signaling via rotatinglight.
  7. Wiring, installation and testing of optical signaling about thestate of a process via 3 colours lights.
  8. Wiring, installation and testing of communication between twointercoms.
  9. Wiring, installation and testing of communication between theintercom and the call station.
  10. Wiring, installation and testing of communication between twointercoms and the access control.
  11. Wiring, installation and testing of communication between theintercom and the access control.
  12. Wiring, installation and testing of communication between twointercoms and the access control.

EXERCÍCIOS MAIS PRÁTICOS A SEREM FEITOS COM A UNIDADE

  1. Several other exercises can be done and designed by the user.

EQUIPAMENTOS SIMILARES DISPONÍVEIS

Qualidade

Serviço pós-venda

Solicitar informação